Power monitoring system of Hawassa industrial park construction and procurement project

更新日期:2021-08-30瀏覽:686次

Abstract:Introduce of Hawassa industrial park project, which adopts intelligent power meters to collect various electrical parameters and switch signals at the distribution site. The system adopts the method of on-site networking. After networking, it communicates through the field bus and transmits it to the background. The power management system realizes real-time monitoring and management of the power consumption of the substation.

 

Keywords:smart power meter; power distribution room; power management system

0Overview
  Hawassa Industrial Park is located in Ethiopia, Africa。
  The protection device, electric energy meter, etc. in the AH1~AH14 cabinets of the 10KV power distribution room at the project site monitor the real-time electrical parameters and other data of the power supply and distribution system during operation.


1Demand analysis

solution:
1) 10kV/35kV substation integrated automation system;
2) Intelligent monitoring background system of distribution network switch station;
3) Coordinated control platform on the demand side of electricity
To ensure the statistics and analysis of electricity load for production management and real-time monitoring of hazard sources. It is necessary to conduct real-time online monitoring of parameters such as voltage (U), current (I), and power (P) in the incoming and outgoing circuit of the distribution box at the project site. Once the monitoring point is monitored with abnormal parameters, it can detect and alarm in time, and relevant personnel can take necessary measures to avoid safety accidents. The automatic meter reading function saves manpower and material resources. The power trend curve function can intuitively display the working status and time of each circuit, which is convenient for users to find abnormal power circuits and make corrections in time, and establish a multi-level electrical energy measurement system to provide energy analysis basis .
The supplier's products should have high safety and reliability, easy to expand, easy to repair and maintain. The products provided by the supplier shall meet the technical requirements at least, but not only this, but the technical performance shall meet the requirements for data monitoring of the distribution box.


2  System solutions
  According to the actual situation of the project, the Acrel-2000 system uses a shielded twisted pair cable to directly connect to the data collector and then directly connect to the monitoring host in the duty room through a network cable. , To ensure the stability and real-time transmission of the power management monitoring system.
The station control management layer is the direct window of human-computer interaction for the management personnel of the power monitoring system. In this project, it mainly refers to the monitoring host of the power distribution room.

  The communication layer is mainly composed of collectors, Ethernet devices and bus networks. The main function of the communication management machine is to monitor the on-site intelligent instruments; the main function of the Ethernet equipment and the bus network is to realize the data interaction between the substation and the main station, so that the management of the distribution system is centralized, informatized, and intelligent, which greatly improves This improves the safety, reliability and stability of the power distribution system, and achieves the goal of unattended operation.
This project uses Acrel's self-developed communication management machine ANet-2E8S1, which provides 2 10/100M Ethernet interfaces, 8 optocoupler isolation RS485 and 1 RS232 (debugging port), which can support 256 metering devices.
  ANet intelligent communication management machine provides rich protocol library support to realize the interconnection of intelligent equipment of different secondary equipment suppliers.
  The field device layer is the data acquisition terminal, which is mainly composed of microcomputer protection and smart meters. The smart meters are connected to the communication server through the shielded twisted pair RS485 interface and the MODBUS communication protocol bus connection. The communication server reaches the monitoring host of the power distribution room. Networking to realize remote control.
  This project uses Acrel's microcomputer line protection and measurement device AM5-F and embedded installation electric energy metering device AEM96.

 

 


3  System functions
  The real-time monitoring system diagram is the main monitoring screen, which mainly monitors the operating status of all circuits in the substation in real time.      
  The remote signaling and remote measurement alarm functions mainly complete the monitoring of the switch operation status of the low-voltage outlet circuits and the load incoming line. The pop-up alarm interface for switch displacement and load limit violations indicates the specific alarm location and sounds the alarm to remind the duty personnel to deal with it in time. The load limit can be set freely under the corresponding authority.
  The event alarm record function mainly completes the record of the alarm information and the occurrence time of the alarm information that occurred during the query time period, and provides the basis for the staff on duty and analyzes the cause of the accident, as shown in the following figure:
  Parameter meter reading function, mainly to query the electrical parameters of the low-voltage outgoing circuit. Supports electrical parameter query at any time, with functions such as data export and report printing. This report queries the electrical parameters of each low-voltage circuit of the inlet and outlet lines of the distribution box of this project, mainly including: three-phase current, active power and active energy. The name of each circuit in this report is associated with the database, which is convenient for users to modify the name of the circuit. 
  The power consumption report function can select the time period for query, supports the cumulative query of the power consumption at any time period, and has the functions of data export and report printing. Provide reliable electric energy report for the staff on duty. The name of each circuit in this report is associated with the database, which is convenient for users to modify the name of the circuit. As shown in the figure below, the user can print the report directly, and save it to another location in EXCEL format.

4  Concluding

  In the application of today’s power distribution facilities, the safety of the project’s power distribution is of paramount importance. The power management system introduced in this article is applied to the Hawassa industrial park project, which can realize power distribution in substations. The real-time monitoring of loop power consumption can not only display loop power consumption status, but also has network communication function, which can form a power management system with communication management machines and computers.
  The system realizes the analysis and processing of the collected data, real-time display of the operating status of each distribution circuit in the power distribution room, pop-up alarm dialog box, voice prompts for load exceeding limit, and generates various electric energy reports, analysis curves, graphics, etc., which is convenient The remote meter reading, analysis and research of electric energy show that the system is safe, reliable and stable, which provides a real and reliable basis for the project to solve electricity problems, and has achieved good benefits.

 

 

Contact Us
  • 郵箱:2885080326@qq.com
  • 地址:上海市嘉定區(qū)育綠路253號

掃一掃  微信咨詢

©2025 安科瑞電氣股份有限公司 版權所有    備案號:滬ICP備05031232號-79    技術支持:智慧城市網    Sitemap.xml    總訪問量:211351    管理登陸

電瓶車充電樁禁止非法改裝

国产精品一区二区三区三级片| 你懂得在线网| 无码国产精品综合久久| 无码人妻一区二区三区线花季传媒| 国产真街拍裙底系列在线观看| 男人的网站国产一区二区在线观看| 黄色网站三级片、| 色综合视频区二区三区44| 超碰免费99| 中文字幕第五区| 美女脱了内裤张开腿让男人桶网站 | 全部免费黄色网站免费| 精品无码一区二区久久| 日韩中文人妻无码九区| 亚洲成a人在线观看中文| 日韩黄日韩欧美| 日韩成人不卡| 精品无码视频一区三区四区| 女人扒开腿让男人狂桶60分钟| 成人免费看黄色视频| 无码人妻AⅤ一区二区三区用会员 狠狠色婷婷久久一区二区 | 国内精品视频成人一区二区| 日韩高清不卡毛片| 日韩美乳少妇水喷| 熟妇性生活一级| 另类小说欧美激情| 少妇精品无码一区二区三区卖人 | 免费观看毛片| 色熟熟| 日韩激情中文字幕| 亚洲精品va午夜中文字幕| 国产一区二区三区性爱| 铜梁县| 色久悠悠成人图区| 亚洲乱码国产乱码精品精鲁大师| 四虎永久在线精品免费下载 | 无码精品人妻在线视频| 一本aⅴ高清一区二区三区| 99热这里都是精品| 天天更新AV| 久久久久高潮综合影院|